Dewatering drilling rigs, configured for your site
Dewatering wells lower the groundwater so excavations, basements and pipelines can be built in the dry. We discuss the job first and propose a rig to suit it.
Start with site access
Dewatering rigs often work inside busy construction sites. The space you have, and how the rig gets in and moves between wells, usually decide the mounting and the size of the rig.
Configuration options we discuss
- Truck, trolley or track mounting, including compact rigs for tight sites
- Rig size and power for your well depth and diameter
- The drilling method for your ground
- The tooling and consumables that go with it
Available options depend on the base rig and your application.
To prepare a proposal, tell us
- How many wells you need, and their depth and diameter
- The ground and the groundwater level, if known
- Where the site is and how much space you have
- Your programme
Tooling and support
We supply the drilling tools and consumables your rig will use, with service, spare parts and operator training from our locations in the UAE, Saudi Arabia and Qatar.
Send us your project details on WhatsApp and our team will come back to you.







